Projects

The Oeko-Institut’s researchers work on more than 350 national and international projects a year, focusing on Chemicals Management and Technology Assessment, Energy and Climate, Emission and Ambient Pollution Control, Radiation Protection, Agriculture and Biodiversity, Sustainable Consumption, Mobility, Resource Management and Industry, Nuclear Engineering and Facility Safety, and Law, Policy and Governance.

Your search results 621 hits:

RoHS dossier on small brominated alkyl alcohols

Project manager: Baron, Y.
End of project: 12 / 2016

In 2014, the Danish EPA performed a survey on brominated flame retardants (BFRs). On the basis of its results, the Danish Technical University (DTU Food) investigated possibilities of grouping BFRs. One of the groupings; the small…

More information

Promoting Sustainable Consumption and Production (SCP) for a Low -Carbon Economy in ASEAN

Project manager: Prakash, S.
Project staff:  Antony, F. | Rüdenauer, I. | Schleicher, T.
End of project: 06 / 2018

The overarching goal is to be able to contribute towards driving the policy framework for promoting the sustainable consumption and production pattern in ASEAN in order to reduce greenhouse gas emissions and other environmental…

More information

Environmental protection guards human rights! The global responsibility of German businesses

Project manager: Kampffmeyer, N.
End of project: 12 / 2017

Professional support and preparation of documents adressing environmental impact assessment of on-site interim storage facility Brunsbüttel

Project manager: Spieth-Achtnich, A.
End of project: 06 / 2018

Within the licensing procedure for new approval of the on-site interim storage facility Brunsbüttel an environmental impact assessment is necessary. Oeko-Institute examines the environmental impacts of the project as well as the…

More information

Assistance provided in connection with crack indications in the reactor pressure vessel of the nuclear power plant Beznau 1

Project manager: Küppers, C.
End of project: 12 / 2016

In 2015, ultrasonic testing indications were discovered in the reactor pressure vessel (RPV) of the Beznau nuclear power plant unit 1 that requires a new verification of the structural integrity by the operator. The Oeko-Institute was…

More information

Support an Impact Assessment of possible Aviation EU ETS Directive review

Project manager: Cames, M.
End of project: 02 / 2017

Briefing on Climate action and the Emissions Trading System (ETS) in China

Project manager: Cames, M.
End of project: 09 / 2016

Scientific monitoring of the implementation of the ecodesign directive and the energy labelling directive - 3rd work programme

Project manager: Graulich, K.
End of project: 07 / 2019

Ziel des Projekts ist es, BMUB und UBA bei ihren Arbeiten zur Umsetzung der Ökodesign- und EVK-Richtlinie wissenschaftlich fundiert zu unterstützen. Konkret erfolgt dies über wissenschaftliche (Zu-)Arbeiten in den folgenden Bereichen:

More information

Maintenance of the Eurostat Chemical Indicator Set

Project manager: Bunke, D.
End of project: 07 / 2019

Indicators are calculated for the production and consumption of chemicals in the EU in the years 2015-2017. In addition, index values are prepared for the use of hazardous chemicals in mixtures for commercial and private use and on…

More information

Institute project on inter divisional substantive advancement and publication on the topic of participation

Project manager: Englert, M.
End of project: 10 / 2017

Market surveillance of the German eco label 'Blue Angel'

Project manager: Fischer, C.
Project staff:  Quack, D. | Brommer, E. | Bunke, D. | Gröger, J. | Stratmann, B. | Teufel, J.
End of project: 09 / 2019

The aim of the project is to develop and test a concept for a market surveillance programme for the environmental label “Blue Angel”. To this purpose, the market surveillance systems of existing eco-labels are being investigated in…

More information

Strengthening the ecological design as a purchasing criterion for consumers

Project manager: Fischer, C.
End of project: 08 / 2018

The overall objective of the project is to strengthen ecological design as a purchase criterion for consumers by improving the consistency of consumer expectations,  product development and business communication. It will also…

More information

Contributions to the German Obligations regarding the National Report and the 6th Review Meeting of the “Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Project manager: Neles, J.
End of project: 11 / 2018

Since preparing Germany’s first national report to the “Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management” (Joint Convention), Oeko-Institute substantially contributes the…

More information

Briefing on "Main options for a GMBM at ICAO during ist High-level Meeting in May 2016"

Project manager: Cames, M.
End of project: 05 / 2016

Streamlining of Climate Change and Energy Reporting Requirements in Areas with Interlinkages

Project manager: Herold, A.
End of project: 04 / 2017

Possible radioactive contamination of Wiese water and raw water of drinking water supply by a severe nuclear accident

Project manager: Küppers, C.
End of project: 07 / 2016

For the drinking water supply from Basel, Rheinwasser is seeped away and treated in a drinking water treatment plant after a passage through soil and groundwater strata. The drinking water supplier from Basel, IWB, intends to use as an…

More information

Evaluation of the answers from the Belgian Authority FANC to 15 questions concerning indications in Belgian NPPs submitted by the German delegation during the workshop of January 11th and 12th 2016

Project manager: Küppers, C.
End of project: 04 / 2016

In 2012 nearly 9000 indications were identified during ultra sonic inspections of the reactor pressure vessel (RPV) in the Belgian NPP Doel 3. Similar defects in lesser numbers were subsequently discovered in the Belgian NPP Tihange 2.…

More information

Implementation of an Emission Trading System in the Republic of Korea

Project manager: Matthes, F.
End of project: 12 / 2018

Briefing on "Key issues at stake at the 69th session of the IMO Marine Environment Protection Committee"

Project manager: Cames, M.
End of project: 04 / 2016

Simulation calculations of xenon isotopic activity ratios for integrated decision tools to detect nuclear test explosions

Project manager: Englert, M.
End of project: 11 / 2016
More information

Project Websites