Evaluation of selected aspects of AREVAs “Phase 1 du Projet de Bakouma - Rapport d’étude d’impact environnemental et social (EIES)”
Projekt manager: Schmidt, G.
End of project: 07 / 2011

Critical Review Concerning LCA BTW Ford & Umicore
Projekt manager: Buchert, M.
End of project: 05 / 2011

Initial e-waste country study Ethiopia
Projekt manager: Manhart, A.
End of project: 04 / 2011

Expertise on the evaluation of radiologic doses on the tailings disposal facility Trünzig/Seelingstädt
Projekt manager: Schmidt, G.
End of project: 04 / 2011
more information

International industrial competitiveness, carbon leakage and approaches to carbon pricing - an analysis of the key sectors / product classification and its implication on competitiveness and carbon leakage
Projekt manager: Schumacher, K.
End of project: 03 / 2011

International industrial competitiveness, carbon leakage and approaches to carbon pricing - an analysis of the key sectors / allocation methods and their implication on competitiveness and carbon leakage
Projekt manager: Schumacher, K.
End of project: 03 / 2011

Green distribution for more climate ambition / Provide CAN-Europe with specific information and a tool to assess the costs for Member States non-EU ETS sectors…
Projekt manager: Schumacher, K.
End of project: 05 / 2011

Green labels – Assessment and critical review of labelling schemes in the field of building and construction
Projekt manager: Gröger, J.
End of project: 01 / 2011

Timely replacement of a notebook under consideration of environmental aspects – life-cycle analysis using the data basis of the EuP preparatory study, ProBas, and Ecoinvent
Projekt manager: Prakash, S.
End of project: 05 / 2011
more information

Certification of low-carbon product groups in China and Germany
Projekt manager: Grießhammer, R.
End of project: 03 / 2011

Development of scientific and technical foundations for a national waste prevention programme
Projekt manager: Dehoust, G.
End of project: 12 / 2010
more information PDF PDF download (1 KB)

Calculations and documentation of the GHG inventory 2009
Projekt manager: Seum, S.
End of project: 12 / 2010

Assessing Mineral Resources in the Human Society: Metal Stocks and Recycling Rates`a report for the International Panel for Sustainable Resource Management
Projekt manager: Buchert, M.
End of project: 06 / 2011

Benchmarking Washington State
Projekt manager: Hermann, H.
End of project: 07 / 2010

Technical support for conducting a review of (EC) No. 842/2006 on certain fluorinated greenhouse gases
Projekt manager: Herold, A.
End of project: 07 / 2011

Proposal for a mehtodology project for EPED
Projekt manager: Timpe, C.
End of project: 08 / 2011

Assessment and Guidelines for Sustainable Liquid Biofuels Production in Developing Countries
Projekt manager: Fritsche, U.
End of project: 06 / 2011

Adaptation to Scientific and Technical Progress under Directive 2002/95/EC - Evaluation of new requests for exemptions and/or review of existing exemptions
Projekt manager: Zangl, S.
End of project: 11 / 2010

Consultancy services to Eurometaux in the development of industry proposals to the raw materials initiative
Projekt manager: Buchert, M.
End of project: 04 / 2010

Carbon footprint analysis – FIFA World Cup 2022 Qatar
Projekt manager: Bleher, D.
End of project: 01 / 2010

Sectoral Approaches to fostering international action on climate change: Assessment of international commitments to reduce greenhouse gas (GHG) emissions compared to the EU, with a particular focus on sectoral approaches, carbon leakage and the inter
Projekt manager: Schumacher, K.
End of project: 09 / 2010

Feasibility study E-waste in Ghana
Projekt manager: Prakash, S.
End of project: 06 / 2010

Review of Decision 280/2004 (Monitoring Mechanism Decision) in view of the agreed Climate Change and Energy package
Projekt manager: Herold, A.
End of project: 06 / 2010

Building local capacity to address the flow of e-wastes and electrical and electronicproducts
Projekt manager: Manhart, A.
End of project: 12 / 2010

Support for the co-decision process and preparation of the implementation of the draft regulation on CO2 emissions from cars
Projekt manager: Zimmer, W.; Hacker, F.
End of project: 12 / 2009

Product Carbon Footprint of green coffee - Comparison of two studies conducted by E.D.E Consulting and by Öko-Institut
Projekt manager: Quack, D.
End of project: 09 / 2009

Service Contract Research & Testing Project on “Consumer requirements on carbon footprint or CO2 labels”
Projekt manager: Quack, D.
End of project: 12 / 2009
more information

Assessment of alternative applications of the 0,1% limit in REACH triggering information on Substances of very high concern (SVHC) in articles
Projekt manager: Groß, R.
End of project: 08 / 2009
more information

Research for: Better use of Biomass for Bioenergy
Projekt manager: Fritsche, U.
End of project: 12 / 2010

Environmental impacts and impact on the electricity market of a large scale introduction of electric cars in Europe, Critical review of literature
Projekt manager:
End of project: 12 / 2009
more information PDF PDF download (1 KB)

A Report on the impact of the environmental measures undertaken by Beijing for the 2008 Olympic and Paralympic Games
Projekt manager: Hochfeld, C.
End of project: 12 / 2008

Development of a CDM methodology and PDD for a CCS project, the North Central Java-B (NCJ-B) Project in Indonesia
Projekt manager: Schneider, L.
End of project: 12 / 2009

Trade flows and cost structure for exposed industries in the EU-27
Projekt manager: Schumacher, K.
End of project: 03 / 2009

Assistance with the revision of the Monitoring Mechanism decision
Projekt manager: Herold, A.
End of project: 04 / 2009

Improving Dwellings by Enhancing Actions on Labeling for the EPBD
Projekt manager: Cames, M.
End of project: 11 / 2009

Post2012 climate regime options for global GHG emission reduction: Analysis and evaluation of regime options and reduction potential for achieving the 2° degree target with respect to environmental effectiveness, costs and institutional aspects
Projekt manager: Schumacher, K.; Schneider, L.
End of project: 08 / 2010

Role of Auctions
Projekt manager: Matthes, F.
End of project: 09 / 2008

Policies to promote sustainable consumption patterns (POPP)
Projekt manager: Barth, R.
End of project: 07 / 2011

The impact of WTO an other trade negotiations on fisheries
Projekt manager: Acker, H.
End of project: 01 / 2009
more information PDF PDF download (1 KB)

Development of a framework for a sectoral carbon market mechanism
Projekt manager: Schneider, L.
End of project: 11 / 2008

eupopp - Policies to promote
Projekt manager: Brohmann, B.; Barth, R.
End of project: 07 / 2011
more information

Critical Metals for the future sustainable technologies and their recycling potential
Projekt manager: Buchert, M.
End of project: 12 / 2008

Bioenergy related studies for the International Panel für Sustainable Resource Management in May 2008
Projekt manager: Fritsche, U.
End of project: 06 / 2008

Sustainability of Bioenergy and Biofuels: Overview of Issues and Perspectives
Projekt manager: Fritsche, U.
End of project: 06 / 2008

REACH Baseline Study : improvement of the satistical coverage of the Risk and Quality indicator system
Projekt manager: Bunke, D.
End of project: 07 / 2009

Assistance in the implementation and operation of the Environment Date Centre for Waste
Projekt manager: Mehlhart, G.
End of project: 12 / 2010
more information

Modelling of the impacts of policies for sustainable use of cars
Projekt manager: Zimmer, W.
End of project: 02 / 2008
more information PDF PDF download (1 KB)

Use of PRODCOM for the Data Centres
Projekt manager: Jenseit, W.
End of project: 12 / 2009
more information

Tasks under the project "Mitigation of climate change in the land-use sector - scope of an international scheme to reduce emissions form deforestation in developing countries"
Projekt manager: Herold, A.
End of project: 10 / 2008

Contextualising behavioural change in energy programmes involving intermediaries and policymaking organizations working towards changing BEHAVIOUR
Projekt manager: Bürger, V.
End of project: 12 / 2010

Developing an analytical framework to assist decision makers and stakeholders in assessing the environmental implications of bioenergy development by providing state-of-the-art information on environmental impacts of the most important biofuel prod.
Projekt manager: Fritsche, U.
End of project: 06 / 2008

Nuclear Power in Liberalised EU Energy Markets
Projekt manager: Schmidt, G.
End of project: 05 / 2008

Programmatic CDM for energy efficiency in the building sector in India
Projekt manager: Harthan, R.
End of project: 06 / 2009

AIB -Support for AIB conferences
Projekt manager: Timpe, C.
End of project: 05 / 2008

Study on hazardous substances in electrical and electronic equipment, not regulated by the RoHS Directive
Projekt manager: Gensch, C.-O.
End of project: 06 / 2008
more information

A European Tracking System für Electricity Phase II (E-Track II)
Projekt manager: Timpe, C.
End of project: 09 / 2009

Adaptation to Scientific and Technical Progress under Directive 2002/95/EC
Projekt manager: Gensch, C.-O.
End of project: 10 / 2008

Peer Review zu "Environmental sustainability for major events – Concept development for the 2011 Rugby World Cup in New Zealand"
Projekt manager: Stahl, H.
End of project: 08 / 2007

Adaptation to scientific and technical progress of Annex II to Directive 2000/53/EC
Projekt manager: Zangl, S.
End of project: 01 / 2008

Report on the brazilian biodiesel programme with focus on its socio-economic sustainabilitiy
Projekt manager: Fritsche, U.
End of project: 12 / 2007

Public Value UV Stabilisatoren
Projekt manager: Grießhammer, R.
End of project: 10 / 2007

Implementation of Environmental Data Centres
Projekt manager: Lohse, J.
End of project: 08 / 2007
more information PDF PDF download (971 KB)

Environmental and economic evaluation of the accelerated replacement of domestic appliances
Projekt manager: Rüdenauer, I.
End of project: 08 / 2007
more information PDF PDF download (336 KB)

Key Social Impacts of Electronics Production and WEEE-Recycling in China
Projekt manager: Manhart, A.
End of project: 06 / 2007
more information PDF PDF download (144 KB)

Policy instruments as innovation in governance: the case of emissions trading
Projekt manager: Voss, J.
End of project: 03 / 2007
more information PDF PDF download (173 KB)

Power Generation Market Concentration in Europe 1996-2005. An Empirical Analysis
Projekt manager: Matthes, F.
End of project: 02 / 2007
more information PDF PDF download (166 KB)

Independent data sources for greenhouse gas (GHG) emissions
Projekt manager: Jenseit, W.
End of project: 07 / 2008

Life Cycle Assessment (LCA) – Recycling of CFC – and HC – containing refrigerator equipment (Summary)
Projekt manager: Dehoust, G.
End of project: 03 / 2007
more information PDF PDF download (201 KB)

Smart Domestic Appliances in Sustainable Energy Systems
Projekt manager: Timpe, C.
End of project: 06 / 2009
more information

Life Cycle Assessment (LCA) – Recycling of CFC – and HC – containing refrigerator equipment
Projekt manager: Dehoust, G.
End of project: 03 / 2007
more information PDF PDF download (612 KB)

Costs and Benefits of Green Public Procurement in Europe
Projekt manager: Rüdenauer, I.
End of project: 07 / 2007
more information PDF PDF download (4214 KB)

OBRA - European observatory for long-term governance on radioactive waste management
Projekt manager: Kallenbach-Herbert, B.
End of project: 10 / 2008
more information PDF PDF download (339 KB)

Updating the Greenhouse-Gas-Impact of Implementing the Bonn 2004 International Action Plan
Projekt manager: Fritsche, U.
End of project: 06 / 2007

Assessment and Improvement of Methodologies used for Greenhouse Gas Projections
Projekt manager: Herold, A.
End of project: 09 / 2008

Service contract to assess and improve methodologies used for GHG projections
Projekt manager: Herold, A.
End of project: 08 / 2008

PFOA Survey and priority setting
Projekt manager: Bunke, D.
End of project: 10 / 2006

TAI Europe (TAI - The Access Initiative)
Projekt manager: Dross, M.
End of project: 10 / 2006
more information

Sustainability Standards for Bioenergy
Projekt manager: Fritsche, U.
End of project: 11 / 2006
more information PDF PDF download (1520 KB)

Life Cycle Analysis on hand-drying systems
Projekt manager: Eberle, U.
End of project: 06 / 2006
more information PDF PDF download (877 KB)

CSR performance of the European coffee industry
Projekt manager: Eberle, U.
End of project: 06 / 2006

Preparatory Studies for Eco-design Requirements of Energy using Products (EuP) (I)
Projekt manager: Graulich, K.
End of project: 12 / 2007
more information

Legal appraisal of nano technologies
Projekt manager: Führ, M.
End of project: 12 / 2006
more information

CSR in the tomato industry / France
Projekt manager: Eberle, U.
End of project: 05 / 2006

CREATE ACCEPTANCE: Cultural Influences on Renewable Energy Acceptance and Tools for the development of communication strategies to promote ACCEPTANCE among key actor groups
Projekt manager: Fritsche, U.
End of project: 02 / 2008

Development of the Closed Cycle and Waste Management Policy Towards a Sustainable Substance Flow and Resources Policy
Projekt manager: Dehoust, G.
End of project: 05 / 2006
more information PDF PDF download (1820 KB)

Development of the Closed Cycle and Waste Management Policy Towards a Sustainable Substance Flow and Resources Policy - Final Report (German Version)
Projekt manager: Dehoust, G.
End of project: 05 / 2006
more information PDF PDF download (1852 KB)

Statement für das Gespräch mit Minister Seehofer am 20.4. 2006, Baden-Württembergische Landesvertretung, Berlin
Projekt manager: Meinel, H.
End of project: 04 / 2006
PDF PDF download (141 KB)

OECD Matrix Projekt
Projekt manager: Bunke, D.
End of project: 03 / 2006
more information PDF PDF download (3320 KB)

Epigenetics, Transgenic Plants & Risk Assessment
Projekt manager: Moch, K.
End of project: 04 / 2006
more information PDF PDF download (1686 KB)

Long-term prospects of CDM and JI
Projekt manager: Cames, M.
End of project: 12 / 2006
more information PDF PDF download (26 KB)

Comparison of Greenhouse-Gas Emissions and Abatement Cost of Nuclear and Alternative Energy Options from a Life-Cycle Perspective
Projekt manager: Fritsche, U.
End of project: 01 / 2006
more information PDF PDF download (196 KB)

Further development of public participation in the site-selection and approval process of a final repository in Germany
Projekt manager: Barth, R.
End of project: 05 / 2006
more information PDF PDF download (60 KB)

Green Goal TM - Legacy Report
Projekt manager: v.A.
End of project: 11 / 2006
more information PDF PDF download (4949 KB)

Screening und Bewertung beispielhafter Zusammenarbeit
Projekt manager: Bleher, D.
End of project: 12 / 2006
PDF PDF download (1035 KB)

Adaptation to scientific and technical progress under the RoHS Directive
Projekt manager: Gensch, C.
End of project: 07 / 2006
more information PDF PDF download (2279 KB)

Supply of statistical services for the development of a baseline study for REACH (Registration, Evaluation and Authorisation of Chemicals)
Projekt manager: Jenseit, W.
End of project: 09 / 2007
more information

The potential of CSR to contribute to the Implementation and integration of EU strategies (CORE)
Projekt manager: Barth,R.
End of project: 12 / 2009

Policies and Measures at Member State Level to Reduce Greenhouse Gas Emissions
Projekt manager: Herold, A.
End of project: 03 / 2008

Comparative Evaluations of Innovative Solutions in European fisheries management (CEVIS)
Projekt manager: Dross, M.
End of project: 10 / 2008

Report of the GEF-STAP Workshop on liquid biofuels
Projekt manager: Fritsche, U.
End of project: 02 / 2006

Social impacts of the production of notebook PCs
Projekt manager: Grießhammer, R.
End of project: 11 / 2006
more information PDF PDF download (559 KB)

Enhancement of sustainable electricity supply through improvements of the regulatory framework of distribution network for DG (DG Grid)
Projekt manager: Bauknecht, D.
End of project: 12 / 2007

Life-Cycle Analysis of Renewable Energy, and sustainable biomass use in the EU-25
Projekt manager: Fritsche, U.
End of project: 05 / 2007

Strengthening the Capacity of ASEAN Business to Invest under the CDM
Projekt manager: Harthan, R.
End of project: 07 / 2006
more information

Eco-Efficiency Analysis of Washing machines
Projekt manager: Rüdenauer, I.
End of project: 11 / 2005
more information PDF PDF download (598 KB)

Giving wings to emission trading
Projekt manager: Cames, M.
End of project: 05 / 2005
more information PDF PDF download (27 KB)

Exposure-based waiving: Concrete specifications of the waiving-conditions in the context of the registration procedure according to REACH
Projekt manager: Bunke, D.
End of project: 06 / 2006
more information PDF PDF download (681 KB)

Exposure-based waiving: Concrete specifications of the waiving-conditions in the context of the registration procedure according to REACH
Projekt manager: Bunke, D.
End of project: 09 / 2005
more information PDF PDF download (697 KB)

New Elements of the International Regime on Access and Benefit-Sharing of Genetic Resources
Projekt manager: Dross, M.
End of project: 05 / 2005
more information PDF PDF download (814 KB)

Analysis of Greenhouse Gas Emissions of European Countries with regard to the Impact of Policies & Measures
Projekt manager: Cames, M.
End of project: 08 / 2005
more information PDF PDF download (27 KB)

Corporate Social Responsibility from a Strategic Management Perspective
Projekt manager: Schmitt, K.
End of project: 04 / 2005
more information PDF PDF download (1057 KB)

Criteria for Assessing Environmental, Economic, and Social Aspects of Biofuels in Developing Countries in ecological, social, and economic terms
Projekt manager: Fritsche, U.
End of project: 02 / 2005
more information PDF PDF download (354 KB)

Assessing the cost impacts of the planned amendment to the German Aircraft Noise Protection Act
Projekt manager: Barth, R.
End of project: 02 / 2005
more information PDF PDF download (3680 KB)

Chemical Product-Services in the EU
Projekt manager: Gensch, C.-O.
End of project: 09 / 2005
more information

Clean Energy Network for Europe (CLEAN-E)
Projekt manager: Bürger, V.
End of project: 12 / 2006
more information

A European Tracking System for Electricity (E-TRACK)
Projekt manager: Timpe, C.
End of project: 06 / 2007
more information

Schemes for extending the operating periods of German nuclear power plants while simultaneously cutting electricity prices
Projekt manager: Matthes, F.
End of project: 05 / 2005
more information PDF PDF download (216 KB)

Global Compact – Global Impact?
Projekt manager: Mohaupt. F.
End of project: 12 / 2005
more information PDF PDF download (1245 KB)

Power Generation Market Concentration in Europe 1996-2004.
Projekt manager: Matthes, F.
End of project: 09 / 2005
more information PDF PDF download (235 KB)

Status report on the current and potential contribution of the waste management sector to climate change mitigation
Projekt manager: Dehoust, G.
End of project: 08 / 2005
more information PDF PDF download (2509 KB)

Evaluation of selected aspects of the environmental assessment report for the Langer Heinrich Uranium Mining Project in Namibia
Projekt manager: Schmidt, G.
End of project: 09 / 2005
more information PDF PDF download (339 KB)

European Climate Change Programme
Projekt manager: Herold, A.
End of project: 08 / 2006

Branch- and product-related emission estimation tool for manufacturers, importers, and downstream users within the REACH-system
Projekt manager: Bunke, D.
End of project: 02 / 2006

Rhetorics and Realities – Analysing Corporate Social Responsibility in Europe (RARE)
Projekt manager: Barth, R.
End of project: 06 / 2007

Energy demand of tumble driers with respect to differences in technology and ambient conditions
Projekt manager: Rüdenauer, I.
End of project: 01 / 2004
more information PDF PDF download (451 KB)

Nuclear Energy, Renewable Energy and Peace
Projekt manager: Sailer, M.
End of project: 08 / 2004
more information PDF PDF download (198 KB)

Comparison of the significant potential environmental impacts of Fast Ethernet and
Projekt manager: Hottenroth, H.
End of project: 03 / 2004
more information PDF PDF download (969 KB)

The outdated paradigm of genetic engineering
Projekt manager: Moch, K.
End of project: 11 / 2004
more information PDF PDF download (293 KB)

Material Flow Analysis of Sustainable Biomass Use for Energy
Projekt manager: Fritsche, U.
End of project: 12 / 2004
more information PDF PDF download (10475 KB)

Local authority strategies to cut CO2 emissions by 50%: The example of the city of Munich (Final report + Summary + Annex)
Projekt manager: Timpe, C.
End of project: 11 / 2004
more information PDF PDF download (1336 KB)

Risk appraisal of genetic engineering in agriculture
Projekt manager: Christ, H.
End of project: 07 / 2004
more information PDF PDF download (501 KB)

Developing Agrobiodiversity
Projekt manager: Barth, R.
End of project: 01 / 2004
more information PDF PDF download (2649 KB)

Production of Organic Fish in Germany
Projekt manager: Teufel, J.
End of project: 06 / 2005
more information PDF PDF download (3653 KB)

Analysis of feeding studies of genetically modified foods and feedstuffs within the European Union: The example of Bt maize
Projekt manager: Wunderle-Becker, D.
End of project: 10 / 2004
more information PDF PDF download (969 KB)

Review study of GMO outcrossing distances
Projekt manager: Brauner, R.
End of project: 09 / 2004
more information PDF PDF download (419 KB)

Emissions trading in international civil aviation
Projekt manager: Cames, M.
End of project: 01 / 2004
more information PDF PDF download (1088 KB)

Draft third act amending the German Genetic Engineering Act (GenTG) of 16.01.2004
Projekt manager: Hermann, A.
End of project: 02 / 2004
more information PDF PDF download (208 KB)

Legislation is good, monitoring is better
Projekt manager: Eimer, H.
End of project: 06 / 2005
more information PDF PDF download (219 KB)

Assessment of the energy policy relevance of lignite mining at the Garzweiler I/II site
Projekt manager: Bauknecht, D.
End of project: 02 / 2004
more information PDF PDF download (1255 KB)

Evaluation of the Radioactivity Release Event in December 2003 at Yonggwang Nuclear Power Plant Unit
Projekt manager: Kurth, S.
End of project: 03 / 2004
more information PDF PDF download (170 KB)

The state of information and communication on the opportunities and risks of new information technologies, exemplified by WLAN
Projekt manager: Graulich, K.
End of project: 01 / 2004
more information PDF PDF download (1058 KB)

Identification of the energy and CO2 savings potential achievable by reusing building elements
Projekt manager: Quack, D.
End of project: 12 / 2004
more information PDF PDF download (340 KB)

Sustainable consumption needs visions
Projekt manager: Eberle, U.
End of project: 08 / 2004
more information PDF PDF download (648 KB)

Consumer Choice and Carbon Consciousness for Electricity (4C Electricity
Projekt manager: Bürger, V.
End of project: 04 / 2004

PROSA Washing Machines
Projekt manager: Rüdenauer, I.
End of project: 12 / 2004
more information PDF PDF download (1203 KB)

Economic measures for the reduction of the environmental impact of air transport:
Projekt manager: Hochfeld, C.
End of project: 03 / 2004
more information PDF PDF download (1489 KB)

Suitability of transgenic plants for producing oral vaccines
Projekt manager: Moch, K.
End of project: 12 / 2004
more information PDF PDF download (541 KB)

Renewable Energy Guarantee of Origin (REGO)
Projekt manager: Bürger, V.
End of project: 04 / 2004

Four years of Global Compact between the United Nations and multinational corporations
Projekt manager: Hochfeld, C.
End of project: 09 / 2003
more information PDF PDF download (52 KB)

Stellungnahme zur Anhörung des Rates für Nachhaltige Entwicklung (RNE)
Projekt manager: Matthes, F.
End of project: 03 / 2003
more information PDF PDF download (470 KB)

Access to Justice in Environmental Matters - ENV.A.3/ETU/2002/0030
Projekt manager: Dross, M.
End of project: 07 / 2003
more information PDF PDF download (2427 KB)

Expert commentary on the EU Commission’s communication on the issue of the co-existence of genetically modified, conventional, and organic crops
Projekt manager: Tappeser, B.
End of project: 04 / 2003
more information PDF PDF download (784 KB)

Long-term aspects of interim storage of fuel elements
Projekt manager: Kallenbach-Herbert, B.
End of project: 05 / 2003
more information PDF PDF download (190 KB)

Flotation tailings disposal in Ensdorf:
Projekt manager: Schüler, D.
End of project: 05 / 2003
more information PDF PDF download (544 KB)

Co-incineration of sewage sludge in the Bexbach power plant:
Projekt manager: Schüler, D.
End of project: 03 / 2003
more information PDF PDF download (908 KB)

Innovative approaches to the creation of jobs in environmental protection
Projekt manager: Cames, M.
End of project: 06 / 2003
more information PDF PDF download (139 KB)

Innovative approaches to the creation of jobs in environmental protection
Projekt manager: Cames, M.
End of project: 06 / 2003
more information PDF PDF download (151 KB)

Expertise on selected points concerning the planned modifications to the Meuselwitz-Lucka combined heat and power plant
Projekt manager: Küppers, P.
End of project: 08 / 2003
more information PDF PDF download (805 KB)

Contributing to the integration of Poland within the European Union in the environmental sphere
Projekt manager: Hermann, A.
End of project: 09 / 2003
more information PDF PDF download (329 KB)

Sustainable construction and housing in Schleswig-Holstein – Measures and Instruments
Projekt manager: Buchert, M.
End of project: 08 / 2003
more information PDF PDF download (497 KB)

Impacts of a European emissions trading system upon German industry + volume of appendices
Projekt manager: Matthes, F.
End of project: 09 / 2003
more information PDF PDF download (3214 KB)

Recovery Options for Plastic Parts from End-of-Life Vehicles: an Eco-Efficiency Assessment
Projekt manager: Jenseit, W.
End of project: 05 / 2003
more information PDF PDF download (1109 KB)

Prestudy of the development of Criteria for improved consumer information service about mobil phones
Projekt manager: Graulich, K.
End of project: 12 / 2003
more information PDF PDF download (1001 KB)

Green Goal - Environmental goals for the 2006 FIFA World Cup
Projekt manager: Hochfeld, C.
End of project: 03 / 2003
more information PDF PDF download (451 KB)

Tellus - Final Evaluation Report Berlin
Projekt manager: Schmied, M.
End of project: 03 / 2006
more information

Converting food systems (Ernährungswende) - Strategies for social-ecological transformation in the societal action space relating to environment - food - health
Projekt manager: Eberle, U.
End of project: 06 / 2005
more information PDF PDF download (149 KB)

Scientific research on transgenic fish with special focus on the biology of trout and salmon
Projekt manager: Teufel, J.
End of project: 12 / 2002
PDF PDF download (1247 KB)

IMPEL Projekt:
Projekt manager: Barth, R.
End of project: 11 / 2002
more information PDF PDF download (367 KB)

Research diversity for the “turnaround in agriculture”
Projekt manager: Moch, K.
End of project: 02 / 2002
more information PDF PDF download (1699 KB)

Integrating private motor vehicle transportation within a German CO2 emissions trading system
Projekt manager: Deuber, O.
End of project: 01 / 2002
more information PDF PDF download (774 KB)

White Paper for the Reform of Chemicals Policy: From Concept to Implementation
Projekt manager: Bunke, D.
End of project: 04 / 2002
more information PDF PDF download (1686 KB)

Electricity labelling
Projekt manager: Timpe, C.
End of project: 06 / 2002
more information PDF PDF download (642 KB)

Final Report for the preparation of an option on the proposed Directive on the Implementation of EU-wide Emission Trading COM(2001) 581
Projekt manager: Cames, M.
End of project: 03 / 2002
more information PDF PDF download (406 KB)

Made by Öko-Institut
Projekt manager: Roose, J.
End of project: 02 / 2002
more information PDF PDF download (1039 KB)

The influence of the human factor on the safety of nuclear power plants
Projekt manager: Bähr, R.
End of project: 12 / 2002
more information PDF PDF download (514 KB)

The contribution of thermal waste treatment to climate protection, air pollution control and resource conservation
Projekt manager: Dehoust, G.
End of project: 04 / 2002
more information PDF PDF download (432 KB)

Contracting for municipal sports facilities
Projekt manager: Cames, M.
End of project: 03 / 2002
more information PDF PDF download (590 KB)

The leisure society between fun, market forces and environmental concerns
Projekt manager: Henseling, C.
End of project: 04 / 2002
more information PDF PDF download (1572 KB)

International agreements on environmental issues
Projekt manager: Tappeser, B.
End of project: 04 / 2002
more information PDF PDF download (122 KB)

Mobility Styles in Leisure Time: Reducing the environmental impacts of leisure and tourism travel
Projekt manager: Götz, K.
End of project: 06 / 2002
more information PDF PDF download (188 KB)

Will consumers retain freedom to choose GM-free food in Germany, given the burgeoning use of genetic engineering in farming and food production?
Projekt manager: Beck, A.
End of project: 07 / 2002
more information PDF PDF download (560 KB)

Power Generation Market Concentration in Europe 1996-2000
Projekt manager: Matthes, F.
End of project: 05 / 2002
more information PDF PDF download (710 KB)

Green genetic engineering and organic Farming
Projekt manager: Barth, R.
End of project: 09 / 2002
more information PDF PDF download (607 KB)

Mobility Styles in Leisure Time: Reducing the environmental impacts of leisure and tourism travel
Projekt manager: Götz, K.
End of project: 12 / 2002
more information PDF PDF download (692 KB)

European Topic Center on Air and Climate Change
Projekt manager: Herold, A.
End of project: 12 / 2006

Last minute for the environment
Projekt manager: Buchert, M.
End of project: 01 / 2001
more information PDF PDF download (1559 KB)

Environment and Tourism
Projekt manager: Schmied, M.
End of project: 12 / 2001
more information PDF PDF download (326 KB)

Security of Supply - A challenge for Energy policy in Europe
Projekt manager: Matthes, F.
End of project: 10 / 2001
more information PDF PDF download (921 KB)

Town-planning and ecological qualities of car-free and car-reduced urban areas
Projekt manager: Christ, W.
End of project: 01 / 2001
more information PDF PDF download (4571 KB)

Critical review of prevailing research approaches relating to agricultural issue areas, safety research and GMO monitoring
Projekt manager: Tappeser, R.
End of project: 11 / 2001
more information PDF PDF download (116 KB)

Life-cycle assessment of the influence of energy standard and structural factors on the environmental effects of dwellings
Projekt manager: Quack, D.
End of project: 01 / 2001
more information PDF PDF download (2711 KB)

Conceptual development of a monitoring programme for the environmental impacts of transgenic crop plants
Projekt manager: Brauner, R.
End of project: 02 / 2001
more information PDF PDF download (1960 KB)

Analysis and comparison of the flexible instruments established by the Kyoto Protocol
Projekt manager: Cames, M.
End of project: 08 / 2001
more information PDF PDF download (1593 KB)

Environment and Tourism
Projekt manager: Schmied, M.
End of project: 12 / 2001
more information PDF PDF download (226 KB)

Appraisal of the draft German Landfill Ordinance
Projekt manager: Dehoust, G.
End of project: 11 / 2001
more information PDF PDF download (515 KB)

2000 market survey of distributed wood gasification systems up to 5 MW
Projekt manager: Steinbrecher, N.
End of project: 04 / 2001
more information PDF PDF download (2457 KB)

Land-use plan up to 2010 for the German city of Freiburg
Projekt manager: Loose; W.
End of project: 07 / 2001
more information PDF PDF download (577 KB)

The sustainability label:
Projekt manager: Eberle, U.
End of project: 01 / 2001
more information PDF PDF download (1732 KB)

A Comparison of Agri-Environmental Schemes in Great Britain and Germany
Projekt manager: Retter, C.
End of project: 01 / 2000
more information PDF PDF download (4019 KB)

The influence of the risk debate and risk research upon approval procedures for the marketing of transgenic plants
Projekt manager: Tappeser, B.
End of project: 05 / 2000
more information PDF PDF download (690 KB)

Who owns biological diversity?
Projekt manager: Tappeser, B.
End of project: 07 / 2000
more information PDF PDF download (178 KB)

Who owns biological diversity?
Projekt manager: Tappeser, B.
End of project: 07 / 2000
more information PDF PDF download (1141 KB)

Instruments and Options for Environmental Policy during the Accession Processof EU Associated Countries in the Area of Environment and Energy
Projekt manager: Cames, M.
End of project: 11 / 2000
more information PDF PDF download (4596 KB)

Behavioural approaches to reducing greenhouse gas emissions in the residential, commercial and institutional sectors
Projekt manager: Brohmann, B.
End of project: 06 / 2000
more information PDF PDF download (838 KB)

Behavioural approaches to reducing greenhouse gas emissions in the residential, commercial and institutional sectors
Projekt manager: Böde, U.
End of project: 08 / 2000
more information PDF PDF download (921 KB)

A practical guide to environmental protection through local development plans
Projekt manager: Roller, G.
End of project: 02 / 2000
more information PDF PDF download (619 KB)

Operationalizing the guiding principle of sustainable development in construction and housing
Projekt manager: Buchert, M.
End of project: 09 / 2000
more information PDF PDF download (1095 KB)

Involving companies in Local Agenda 21 processes in Germany
Projekt manager: Menzel, S.
End of project: 12 / 2000
more information PDF PDF download (1010 KB)

First class for everyone
Projekt manager: Werner, P.
End of project: 01 / 2000
more information PDF PDF download (1139 KB)

Greenhouse Gas Emissions Trading within the European Union
Projekt manager: Dette, B.
End of project: 01 / 2000
more information PDF PDF download (105 KB)

Report on the state of knowledge concerning potential health effects of mobile phones
Projekt manager: Benischke, A.
End of project: 12 / 2000
more information PDF PDF download (2822 KB)

From low-energy dwellings to low-pollution dwellings
Projekt manager: Graulich, K.
End of project: 01 / 2000
more information PDF PDF download (1178 KB)

Environmental consequences of food consumption
Projekt manager: Jungbluth, N.
End of project: 02 / 2000
more information PDF PDF download (2011 KB)

Analysis of observed adverse effects from the release of genetically modified organisms
Projekt manager: Tappeser, B.
End of project: 01 / 2000
more information PDF PDF download (381 KB)

The influence of different agricultural systems on the food situation in Germany, depending on consumer behaviour
Projekt manager: Seemüller, M.
End of project: 01 / 2000
more information PDF PDF download (842 KB)

Analysis of observed adverse effects from the release of genetically modified organisms
Projekt manager: Tappeser, B.
End of project: 01 / 2001
more information PDF PDF download (385 KB)

Client-focused greening of product development and marketing
Projekt manager: Klaffke, K.
End of project: 01 / 2000
more information PDF PDF download (628 KB)

Environmental funds compared
Projekt manager: Grießhammer, R.
End of project: 01 / 2000
more information PDF PDF download (284 KB)

Action plan for a local information and motivation campaign to promote energy-aware behaviour in the city of Darmstadt
Projekt manager: Grimpe, G.
End of project: 12 / 2000
more information PDF PDF download (999 KB)

Forests for climate protection?
Projekt manager: Herold, A.
End of project: 10 / 1998
more information PDF PDF download (147 KB)

Review of the evaluation of the Xylanase product made from genetically modified micro-organisms
Projekt manager: Tappeser, B.
End of project: 02 / 1997
more information PDF PDF download (249 KB)

A Green scenario for turning energy systems towards sustainability by 2020:
Projekt manager: Fritsche, U.
End of project: 03 / 1990
more information PDF PDF download (560 KB)

Can environmental protection be measured?
Projekt manager: Tebert, C.
End of project: 01 / 1999
more information PDF PDF download (1073 KB)

Globalization of the pantry – Towards sustainable nutrition (Volume 2)
Projekt manager: Dette, B.
End of project: 01 / 1999
more information PDF PDF download (540 KB)

Globalization of the pantry – Towards sustainable nutrition (Volume 1)
Projekt manager: Baier, F.
End of project: 01 / 1999
more information PDF PDF download (6291 KB)

Energy savings performance contracting as a contribution to climate protection and cost reduction
Projekt manager: Cames, M.
End of project: 01 / 2000
more information PDF PDF download (7318 KB)

Fair Trade catering products and sustainable food
Projekt manager: Baier, A.
End of project: 01 / 1999
more information PDF PDF download (1100 KB)